RD2.1 Environmental Impact Classification Form

(see FM2:3.1.5)

UNIVERSITY OF CALIFORNIA

ENVIRONMENTAL IMPACT CLASSIFICATION

Campus of Field Station _________________ Project Account ________________________

Project Title _________________________________________________________________

For purpose of compliance with the California Environmental Quality Act of 1970 (CEQA), and Amended University of California Procedures for Implementation of CEQA, this project has been reviewed and initially classified as indicated below. Please check (X) as appropriate. Include project description and appropriate local map.


  1. EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT OF 1970
    When it can be seen with certainty that there is no possibility the action will result in physical change to the environment or the action is specifically exempted by statute, the project is classified as exempt from CEQA.
  2. CATEGORICALLY EXEMPT

This project falls under the indicated Class of Exemption and there is no significant effect on the environment:

____ Class 1:   Existing Facilities ____ Class 16: Transfer of Ownership of Land in order to Create Parks
____ Class 2: Replacement or Reconstruction ____ Class 17: Open Space Contracts
____ Class 3: New Construction Small Structures ____ Class 18: Designation of Wilderness Areas
____ Class 4: Minor Alterations to Land ____ Class 19: Annexation of Existing Facilities and Lots
____ Class 5: Alterations in Land Use Limitations ____ Class 20: Changes in Organization of Local Agencies
____ Class 6: Information Collection ____ Class 21: Regulatory Enforcement Actions
____ Class 7: Regulatory Protection of Natural Resources ____ Class 22: Educational Programs
____ Class 8: Regulatory Protection of the Environment ____ Class 23: Normal Operation
____ Class 9: Inspection ____ Class 24: Regulations of Working Conditions
____ Class 10: Loans ____ Class 25: Transfer of Ownership to Preserve Open Space
____ Class 11: Accessory Structures ____ Class 26: Acquisition Housing for Housing Assistance
____ Class 12: Surplus Government Property Sales ____ Class 27: Leasing New Facilities
____ Class 13: Acquisition for Conservation ____ Class 28: Small Hydroelectric Projects
____ Class 14: Minor Additions to Schools ____ Class 29: Cogeneration Projects
____ Class 15: Minor Land Divisions

  1. INITIAL STUDY
    This project is not Exempt from CEQA or Categorically Exempt; an Initial Study is to be prepared to determine if the project may have significant effect on the environment that has not been substantially and adequately analyzed in a certified program EIR. Checklist ________ Narrative ________
  2. ENVIRONMENTAL EMPACT REPORT (EIR)
    It is known that the project will have a significant effect on the environment and has not been adequately and substantially analyzed in a certified program EIR.

    PROJECT DESCRIPTION


  3. Does this project conform to the approved LRDP? _____YES _____NO
  4. Prepared by _______________________ Date _______________

    Approved by _______________________ Date ______________

  5. OFFICE OF THE PRESIDENT COMMENTS

    _____ Concur with Classification _______________________________________________

    _____ Does not Concur ______________________________________________________

Signed: _________________________________ Date: _________________