Facilities Manual
RD1.5: Material Substitution Proposal
(see FM5:11.3.5)
To: {University's Representative}
Name:
Project:
Project No.:
- We hereby submit for your consideration the following product instead of the specified item:
- Section _________________ Article Number ____________________
- Specified Item _______________________________________________
- Proposed Substitution (Mfg., Type, Model, etc.) ______________________________
- Section _________________ Article Number ____________________
- Complete all of the following:
- Does this substitution offer University a cost credit (including costs for changes by other subcontractors)?
_____Yes _____No How much?______________
- Does this substitution offer earlier delivery or less Contract Time?
_____Yes _____NoHow much and why? _________________________________________________________________
- How does this substitution affect any dimensions, layout, or details of other subcontractors as shown on the Drawings?
__________________________________________________________________ - What are the specific differences between this substitution and the specified item?
__________________________________________________________________
- Does this substitution offer University a cost credit (including costs for changes by other subcontractors)?
- Attach the following as applicable (Check if attached)
- Manufacturer's technical data _____
- Laboratory test or performance results _____
- Drawings & wiring diagrams of the proposed product _____
- Drawings & description of changes required by other subcontractors _____
- Samples _____
- Manufacturer's guarantee & maintenance instructions _____
- Submitted by Contractor ____________________________________________________
Signature ________________________ Date ________________________
For Use Only by University's Representative | |||
---|---|---|---|
Accepted | Rejected | Revise and Resubmit | See Attached |